List the equipment, rack count and expected power per rack. Four racks at 8 kW each need 32 kW in total. Check rack power, cooling and available capacity at the selected center before confirming the monthly rate and electricity charges.
Internet access is measured in Mbps. Public IP addresses are billed per address. For a private circuit, provide both endpoints, target bandwidth and backup requirements so the team can verify the route and delivery conditions.
Choose a scenario in Business Enquiries and enter your objectives, target launch date and existing equipment to generate a draft. For a follow-up with an account manager, add your contact information and any open questions.