When will committed power be available?
Align grid approvals, first-phase IT load and customer ramp-up before sizing the first phase or releasing an expansion.

AI Computing Solutions
Plan power, capital, cluster performance and customer operations around the workload. MYE helps owners decide when to invest, how to validate the system and how to run it after launch.
Grid connections and critical equipment have different lead times. Costs, rack densities and customer demand also change. Together they determine which phase an owner can bring into service and when billing can begin.
Figures cover data centers of all types worldwide. The 2030 value is a scenario projection.
IEA · Key Questions on Energy and AI (2026) ↗Align grid approvals, first-phase IT load and customer ramp-up before sizing the first phase or releasing an expansion.
Review rack power, liquid-cooling interfaces, GPUs, networking and storage together. Schedule long-lead items against facility readiness.
Match available capacity, customer acceptance and billing start dates for each order, then track service costs, renewals and collections.
Industry context on power availability, costs and supply constraints: Uptime Institute Global Data Center Survey 2026 ↗
Investors, campuses and owners planning new builds or retrofits
Start with customer workloads and installation commitments. Verify utility power, site, connectivity and cooling. Bring facilities, cluster equipment, operating costs and phasing into one investment model for the owner.
Resolve gaps between demand, available resources and investment scale with a verifiable basis for project approval and investment decisions.
Best fit Proposed investment, new-build or phased expansion
Align capacity, budget and operating assumptions to identify investment timing and key risks
Based on site count, capacity, research depth and model complexity
Payments at kickoff, draft delivery and final acceptance
Specialized approvals, site testing and additional scenarios are scoped separately; model outputs depend on assumptions
Resolve mismatches in power, cooling, racks and construction timing, reducing under-provisioning and excessive reserved capacity.
Best fit New facilities, high-density retrofits and phased expansion
Create a common baseline for detailed design, procurement and construction coordination
Project fee based on MW capacity, disciplines, design depth and retrofit complexity
Milestones for concept design, detailed review and handover
Construction drawings, design approvals and specialist engineering are separately scoped with appropriate design firms
Prevent bottlenecks caused by isolated compute, storage, network and platform choices with workload- and budget-led system design.
Best fit AI training, inference platforms and research clusters
Guide procurement with one architecture and acceptance baseline, reducing integration uncertainty
Based on compute nodes, fabric scale, software integration and validation depth
Milestones for requirements, architecture review and design delivery
Design is itemized separately from hardware, licenses and implementation
AI companies, cloud providers, researchers and cluster deployment teams
Size the system for the target training or inference workload. Check interfaces across facilities, compute, networking, storage and scheduling. Agree compatible parts and substitutions before buying, then validate the cluster with customer jobs and hand over its configuration baseline.
Turn purchased equipment into usable resource pools by connecting facility readiness, compute integration, platform deployment and workload validation.
Best fit Cloud providers, AI companies and research platforms
Turn a bill of materials into a manageable, scalable and verifiable cluster with coordinated delivery
Itemized hardware, licenses, implementation, testing and training; optional annual technical support
Payments tied to procurement, delivery, deployment and acceptance
Third-party equipment leasing or staged procurement can be coordinated; funding costs and contracts are separate
Address communication bottlenecks, compatibility and expansion planning with an InfiniBand or RoCE design suited to the workload.
Best fit GPU clusters, research computing and AI computing centers
Validate end-to-end communication against agreed workloads, with a baseline for performance and expansion
Based on node / port count, topology and test scope; design-only engagements available
Milestones for design, delivery, commissioning and performance acceptance
Vendor support, spares and annual network operations are configured separately by service level
Third-party data center owners, campuses and infrastructure investors
At transition, review facilities, staffing, live contracts and customers. Agree service boundaries and escalation paths. Assign shifts, changes and incident response by role, deliver each customer order and review operating and commercial results monthly.
Address gaps in staffing, procedures and incident readiness with defined responsibilities and traceable facility operations.
Best fit Third-party facilities preparing to launch or already operating
Improve operational consistency and give owners visibility into condition, risk and performance
Based on managed capacity, system complexity, shifts, staffing and SLA
Choose a fixed service fee or verified staffing / subcontractor costs plus a management fee, billed periodically
Major repairs, spares, energy and retrofits are separate; performance adjustments are agreed in the contract
Bridge sales commitments, available resources and launch schedules by turning each order into an actionable, traceable delivery plan.
Best fit Centers onboarding new customers or expanding services
Unify customer and site coordination to reduce delays and rework, with clear delivery progress
Workload assessed by racks, devices, links, cutover complexity and delivery windows
Per-batch acceptance, or recurring agreed volumes with defined overage rates
Equipment, cables, transport and out-of-window work are itemized without duplicating operations-package charges
Connect available capacity with customer demand and ongoing service. Draw on capabilities supporting 3,600+ customers to coordinate enquiries, delivery, support and renewals.
Best fit Owners seeking customer acquisition, service management and renewal support
Connect acquisition with ongoing care, improving resource matching and supporting long-term operations
Base fee determined by customer volume, staffing and service hours
New-customer fees may be an agreed share of eligible receipts or a fixed success fee, with attribution and periods defined in advance
Define tax, energy and pass-through exclusions; contracting, occupancy and collections are verified against actual progress
Site conditions determine deliverable capacity, suppliers determine lead times and funding affects phasing. MYE reviews all three at design sign-off.
Wuhan spans core and campus edge sites, while Shannan’s first phase targets 40 kW training racks. Design reviews check site power, cooling, connectivity and maintenance windows.
Explore site specificationsFacilities equipment, GPUs, switches and optics are priced as compatible kits. The procurement plan records approved substitutes, lead times and warranty boundaries.
Explore sourcing and price analysisWhere appropriate, coordinate staged purchases or equipment leasing and align payment with delivery, acceptance and launch. Third parties approve and contract independently, with funding costs itemized.
Each quote identifies tasks, deliverables and acceptance milestones. Commission one service or combine stages under a single scope review to avoid duplicate charges.
Project consulting fees · deliverable-based milestones
Hardware & licenses + integration + optional annual support
Recurring service fees + optional customer acquisition fees
Amounts, tax, SLAs, staffing and performance measures are agreed in the project proposal and contract.