Illustration of an accelerator board, a network switch and optical transceivers

Supply Chain Services

Global sourcing for AI infrastructure

Drawing on years of procurement experience and longstanding supplier relationships, MYE sources scarce compute and networking equipment, assesses pricing and lead times, and coordinates compliant purchases around your cluster launch.

Browse equipment ↓
Compute and network equipment illustration

Sourcing scarce compute and network equipment

GPU servers, high-speed switches, adapters and optics must work together at launch. Procurement verifies each source of supply while cluster engineers check that the complete system can be deployed.

Price outlook and purchase timing

These examples show how we advise a project. Each forecast records its evidence, assumptions and validity period for review before an order is placed.

Lead times are extending

We check available models, batch sizes, evidence for lead times and warranty coverage with established suppliers. Engineers review power, cooling and interconnect compatibility for alternatives.

DeliverableCandidate part numbers, delivery batches and conditions for substitution

Quotes for the same part diverge

We compare recent purchases and valid quotations on the same part number, configuration, tax, freight and warranty basis. Supply schedules, lead times and exchange rates inform our assessment of price pressure and budget ranges.

DeliverableComparable quotes, budget ranges, validity periods and a review date

The facility will go live in phases

We line up complete server, switch and optics kits with rack energization and network commissioning. We compare the cash and schedule implications of a single order against phased purchases.

DeliverableRecommended order windows, a first-batch kit list and follow-on purchases

Have a bill of materials or a target launch date?

Trade compliance in global procurement

A cross-border order begins with confirming that the equipment can be supplied lawfully. MYE builds transaction review, source verification and document traceability into purchasing so customers can check the origin and delivery responsibilities for each batch.

  1. Verify the supplier and the source

    Check the selling entity, channel documentation, equipment condition and warranty provider. Confirm the scope of authorization with the manufacturer where needed.

  2. Review cross-border requirements

    Review applicable trade restrictions, import and export requirements, and licensing for the equipment, destination, end user and end use. Obtain required approvals before purchase and shipment.

  3. Trace receipt through warranty

    Reconcile contracts, packing lists and serial numbers with the delivered equipment. Record each batch, discrepancy and acceptance result, then hand over the asset and warranty registers.

Equipment sourcing directory

Confirm models, quantities, acceptable substitutes and required delivery dates for your bill of materials. Enquire about one item or have MYE coordinate the complete system.

Compute infrastructure

01

Power Systems

Transformers, switchgear, busways, ATS/STS, UPS, batteries and generators

02

Cooling & Liquid Cooling

Chillers, precision cooling, cooling towers, pumps, CDUs, cold plates and liquid loops

03

Racks & Facility Fit-out

Standard and high-density racks, PDUs, containment, cable trays, grounding and fit-out

06

Security & Fire Protection

Network security, access control, CCTV, fire detection and suppression

07

Monitoring & Operations Platforms

Sensors, acquisition gateways, environmental monitoring, DCIM, NOC and portal integration

Compute and network clusters

04

Compute & Storage

GPU / CPU servers, storage systems, management nodes, backup equipment and accessories

05

Network & Interconnection

IB / Ethernet switches, routers, optics, fiber and structured cabling

08

Software & Technical Services

Compute cloud software, system licenses, integration, manufacturer support and spares

Longstanding supply relationships

MYE has worked with core suppliers over years of repeat purchases. At project start, buyers coordinate part numbers and batches with manufacturers, distributors and integration partners. Engineers agree substitutions, site installation and warranty responsibilities.

Infrastructure supply chain

Power distribution
Schneider Electric, ABB and Siemens authorized panel builders
UPS systems
Huawei
Diesel generators
Cummins
Cooling and liquid cooling
TONGFEI, Envicool
Racks and facility fit-out
Huawei, Envicool
Security and fire protection
MYE in-house systems integration

Compute and network supply chain

Compute equipment and systems integration
NVIDIA, Huawei, Supermicro, Inspur, Huaqin, TTY, Lenovo, Yaneng Computing
Networking and optical communications
H3C, Ruijie, YOFC, FiberHome, Accelink, RayOptek
Software platforms and technical services
MyesAI

Brands, contracting suppliers and support coverage are confirmed in each procurement schedule.

Explore MYE and partners ↗

From a bill of materials to a running cluster

MYE brings the experience of designing, building and operating its own data centers to procurement. Installation requirements, acceptance criteria and service responsibilities are set when equipment is specified.

  1. Design and selection

    Work back from compute targets, rack power and cooling capacity to a bill of materials with mandatory specifications.

    Investment and planning ↗
  2. Integration and commissioning

    Rack and cable delivered equipment, build the IB/RoCE network and commission the cluster against acceptance criteria.

    IB/RoCE fabric design ↗
  3. Operations and expansion

    Hand equipment registers, warranties and critical spares to the operations team, and use service records to plan expansion.

    Data center operations teams ↗
Equipment Procurement

Coordinate facilities, servers, networks and software procurement, from selection and price comparison to delivery acceptance.

  • Requirements and configuration checks
  • Manufacturer and supplier price comparison
  • Lead-time coordination and delivery acceptance
  • Manufacturer warranty coordination
Spares Assurance

Build a critical-spares plan with the resources and processes to respond to equipment faults.

  • Critical spares inventory
  • Shared and dedicated spares plans
  • Spares stock and allocation
  • Fault response to agreed requirements
Equipment Lifecycle Management

Connect asset records, warranties, refreshes and retirement for traceable equipment status.

  • Asset registers and stocktakes
  • Warranty and extended-warranty management
  • Firmware and compliance update coordination
  • Retirement assessment and compliant disposal
Compute Equipment Custody & Operations

On-site maintenance, equipment health checks and asset reporting for third-party-owned compute assets.

  • On-site maintenance and health inspections
  • Insurance and manufacturer support coordination
  • Utilization and monthly reports
  • Settlement documentation for asset owners

MCS / SOLUTION STUDIO

Let us define your requirements

Find the right service

PRIVACY & USE

Privacy & Use

Discovery briefs are generated in the browser. Choosing Save on this device stores a draft in this browser; downloads stay on your device.

When you request sales follow-up and confirm, MYE stores your contact, project details and proposal revision for manager review, proposal discussions and resource checks. An essential cookie lets this browser retrieve its submitted requests.

The website certification image is provided by Xinchacha and requested from that service when the page loads. Filing and certification links open the corresponding external websites.

Product specifications, site availability and service commitments are subject to formal quotations, service descriptions and contracts. Roadmap content does not mean all features are available.

Contact sales@mye.hk